3-Phase Commercialization Roadmap

Phased execution scaling from R&D prototype validation to full indigenized reel-to-reel REBCO coated conductor tape production — reducing India's import dependency on foreign HTS wire.

0–12 mo
Prototype Lab
12–30 mo
Pilot Wire Line
5–7 yr
Full REBCO Pilot
Phase 1  ·  0 – 12 Months

Prototype Lab

Establish the measurement, characterization, and short-sample wire fabrication infrastructure. Prove the ZR-HTS wire architecture before major CAPEX deployment.

Primary Objective

Produce 1–10 m ZR-HTS wire samples and validate their critical current (Ic) retention, mechanical bend performance, and cryogenic characterization reproducibility.

Milestone Deliverables
  • 1–10 m ZR-HTS wire samples with validated Ic measurements at 77K
  • Bend radius & handling mechanical performance testing
  • Repeatable cryogenic characterization rig setup
  • IBAD-MgO and CeO₂ buffer layer deposition validation on Hastelloy
Prototype Lab HTS Wire Testing
Phase 2  ·  12 – 30 Months

Pilot Wire Line & Devices

Convert commercially sourced REBCO tapes into saleable ZR-HTS wire and conductor device products. Deploy the first commercial pilot lots to customers for integration testing.

Primary Objective

Deliver HTS device prototypes (SFCL coils, power line sections) and establish 50–100 m saleable conductor production capability scalable to kilometer lengths.

Milestone Deliverables
  • 50–100 m saleable conductor pilot lots delivered to B2B customers
  • HTS device prototypes — Fault Current Limiter (SFCL) coil demonstrations
  • Cryogenic joint & lamination process standardization
  • Continuous reel-to-reel production capability established
Pilot Wire Line HTS Tape Spool
Phase 3  ·  5 – 7 Years

Full Coated-Conductor Pilot

Localize the highest-value component of the HTS tape supply chain — the REBCO superconducting thin-film deposition itself — eliminating India's dependency on foreign tape imports.

Primary Objective

Produce 10–100 m of in-house REBCO tape with integrated Indian tape-to-wire stack and establish a full domestic commercial supply chain.

Milestone Deliverables
  • 10–100 m in-house REBCO tape with verified Ic performance
  • Integrated Indian HTS tape-to-wire manufacturing stack
  • Full domestic supply chain for fusion and grid cable customers
  • Rare-earth oxide precursor synthesis localization
Full Coated Conductor REBCO Tape Reel